Truck iconGET FREE NEXT-DAY DELIVERY
(on orders over £100 placed before 5pm Mon - Fri)

ZipWall® Pole (3.66m)

ZipWall® Telescopic Extendable and Adjustable Poles for Dust Protection

  • 3.66m Pole

    £45.90 £38.25 Ex. VAT

    In stock

Product overview

Robust and durable, this patented system is superior to other screening methods as there is an integral spring-loaded head, which can be instantly locked in pace by simply twisting the telescopic poles. This ensures that the tension is always maintained between the ceiling and the floor meaning that runs of up to 3m are possible between poles.

Whilst other temporary screening systems require numerous fixing accessories, which can get lost or misplaced, the ZipWall(R) pole is a two-piece system which is assembled in seconds and ready for use.

A variety of Protec screening materials can be used in conjunction with the ZipWall(R) Poles including Flame Retardant or standard polythene, Flame Retardant Barrier Sheet or Flame Retardant Promesh HD 1207.

Delivery options

UK delivery

Standard 2 day delivery (weekdays)
Next working day delivery
Next working day, before noon

International delivery available
Call +44 1625 855 600

Key features

  • Quick and easy to use No training needed, a 10m screen can be erected in 5 minutes
  • Flexible Can adapt to the exact length, height (up to 3.66m) and shape required
  • Adjustable Can be used on suspended, angled and vaulted ceilings
  • Professional appearance Enhances onsite image
  • Cost effective System is reusable

Customer Reviews

Write a customer review
  • Paul Merritt
    3rd Aug 2011

    Usage: Holding polythene sheeting, to screen off asbestos removal

    Stunning Product

    Easy to use and reuseable again and again. We tend to use these to place temporary polythene sheeting in domestic (and industrial) premises to screen off areas during asbestos removal. Product is durable, easy to use, light to transport and has saved us money as we previously used timber, which would be cut to fit and then disposed of on completion.

Trusted by the industry